Blackmoor
Grade: II*
Grant: £12,500
Works: The chancel floor is sinking and problem is accelerating. Edges closest to outside walls remain in position but central portion of floor and dropped by approx 100mm. Solution approved by DAC. Works to lift floor and replace supporting arches with new structure – beam and block with lime concrete screed over.